logisticslad: (Default)
[personal profile] logisticslad
So after working on it today and last Friday, they feel they are about 70% done. The new A/C, humidifier, and furnace have been installed, but the ductwork that connects the furnace to the duct system must be modified. They've rigged it so that I can turn on the heat tonight if I need it, but they must return later this week in order to finish the job and tie all the systems to the thermostat control. So they will call me tomorrow to let me know when they expect the new duct parts arrive.

Well at least I have had some time to catch up on Dr. Who and try out the new vampire detective show Moonlight...

Profile

logisticslad: (Default)
logisticslad

June 2017

S M T W T F S
    123
45678910
11121314151617
181920212223 24
252627282930 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 9th, 2025 04:11 am
Powered by Dreamwidth Studios